 |
| |
|
| Project: |
One New Change |
| Client: |
CMF Limited |
| Description: |
Survey & Detailing: 7 No Core Stair Balustrades & Wallrails (139 No Flights) and 3 No Ships Ladders |
| |
|
|
|
| |
|
| Project: |
Cranleigh Prep School Chapel Steelwork |
| Client: |
M&G Fabrications Limited |
| Description: |
Survey, Connection Design & Detailing:
New gallery steelwork for organ & choir including 2 No steel access stairs. |
| |
|
|
|
| |
|
| Project: |
Holbourne Museum Bath |
| Client: |
Gibbs Engineering Limited |
| Description: |
80 tonnes of Structural Steel framing and feature Mezzanine Floor Steelwork. Main floors as welded assemblies to minimise site program.
Architectural Metalwork package including Feature Staircase and Void Balustrades with elliptical timber toprail. |
| |
|
|
|
| |
|
| Project: |
Hayes Central |
| Client: |
Bourne Special Projects |
| Description: |
Survey & Detailing: 18 No Core Stair Balustrades & Wallrails (250 No Flights) and Balcony Steelwork, Glass Balustrade & Timber Decking. |
| |
|
|
|
| |
|
| Project: |
49 Park Lane |
| Client: |
Glentworth Fabrications Limited |
| Description: |
Detailing: 9 No Storey Main Stair Carcass & Balustrade and 8 No Storey Fire Fighting Stair & Balustrade.
Lightwell Stair, Platform & Ladders.
Ground Floor Railings & Gate.
4th to 6th Floor Balcony Balustrades.
7th Floor Roof Terrace Balustrade. |
| |
|
|
|
| |
|
| Project: |
Granta Park, Cambridge |
| Client: |
Glazzard (Dudley) Limited |
| Description: |
Detailing: 6 No External 2 Storey Spiral Stairs & Balustrades.
3 No Internal 2 Storey Entrance Stair Carcass & Balustrade. |
| |
|
|
|
| |
|
| Project: |
20 Gresham Street |
| Client: |
CMF Limited |
| Description: |
Detailing: 4 No Core Stairs (59 No Flights) comprising Stainless Steel Toprail, Machined Core Balustrade & Wallrails.
4 No levels of Structural Glass Balustrade, Stainless Steel Topail & Aluminium Fascia. |
| |
|
|
|
| |
|
| Project: |
Portwall Lane, Redcliffe, Bristol |
| Client: |
Bourne Special Projects |
| Description: |
Detailing: 2 No Atrium Stairs including Stainless Steel & Glass Balustrading. Stainless Steel & Glass Balustrading to 2 No Atrium Voids & Bridge Walkways over 4 Floors. Painted Mild Steel Balustrade to Core Stair. |
| |
|
|
|
| |
|
| Project: |
Chertsey Bridge Wharf |
| Client: |
Craufurds Engineering Services |
| Description: |
Survey & Detailing: 28 No 2 storey steel framed balconies, incorporating timber perforated infill balustrade, timber decking and handrail. 30 No Juliet Balconies, incorporating perforated infill balustrade and timber handrail. Perforated infill panel balustrade to 2 No core stairs. Parapet handrail to penthouse. |
| |
|
|
|
| |
|
| Project: |
Block 4, Green Quarter, Manchester |
| Client: |
Bailey |
| Description: |
Detailing: Aluminium bull-nose fascia and soffit system to 15th Floor Drum Roof. Bull-nose fascia fabricated with curved leading edge and facetted rear, curved facetted soffit and flat rear soffit. |
| |
|
|
|
| |
|
| Project: |
Milton Court |
| Client: |
Glentworth Fabrications Limited |
| Description: |
Detailing: Fully welded steel stair carcass, with 550x25 flat bar stringers and 8mm tread / landing plates. Curved half landings and square main landings. Stair supported on central fin wall steelwork, with tapered RHS outriggers and 8mm plate cladding. High level bridge link to existing elevated walkway. Full depth 45x10 flat bar balustrade with stainless steel handrail throughout. Stone finishes to stair, landings and bridge link. |
| |
|
|
|
| |
|
| Project: |
Cedarwood - Chineham Business Park |
| Client: |
Glentworth Fabrications Limited |
| Description: |
Detailing: 3 No steel stairs. Consisting of steel carcass, flat bar balustrade and stainless steel wire infill |
| |
|
|
|
| |
|
| Project: |
14 Cornhill, London |
| Client: |
CMF Limited |
| Description: |
Detailing: Feature tubular steel mezzanine with structural glass floor and balustrade. Architectural steel staircase with glass balustrade |
| |
|
|
|
| |
|
| Project: |
Haberdashers Askes Knights Academy, Bromley |
| Client: |
Bourne Special Projects Limited |
| Description: |
Detailing: Brise Soleil Steelwork, infill balustrade to 11 No core stairs,stainless steel entrance ramp balustrade and catladders to roof level plant areas |
| |
|
|
|
| |
|
| Project: |
More3 & More4 Riverside, London |
| Client: |
Glentworth Fabrications Limited |
| Description: |
Detailing: Infill type core balustrade, landing balustrade & wallrails to 7 No 11 storey stairs. |
| |
|
|
|
| |
|
| Project: |
Pitt Rivers Museum, Oxford |
| Client: |
Glentworth Fabrications Limited |
| Description: |
Survey & Detailing: Feature escapee stair & infill balustrade, stainless steel & structural glass void balustrade to public areas, infill type balustrade to external walkways & roof terraces and 2 No back of house stairs with balustrade |
| |
|
|
|
| |
|
| Project: |
Royal Festival Hall, London |
| Client: |
Graham Wood (Structural) Limited |
| Description: |
Detailing: New production attic flooring support steelwork & lighting bridge walkway gantries, including steel stairs and twin rail balustrade |
| |
|
|
|
| |